Free Online Encyclopedia - Easy Encyclopedia
 
Search the Encyclopedia:
  Home
  Welcome to
  Easy Encyclopedia
  Mathematical and
  Natural Sciences

  Astronomy
  Biology
  Chemistry
  Computer science
  Earth science
  Ecology
  Health science
  Mathematics
  Physics
  Statistics
  Applied Arts
  and Sciences

  Agriculture
 
Architecture
  Business
  Communication
  Education
  Engineering
  Family and
  consumer science

  Government
  Law
  Library and information
  science

  Medicine
  Politics
  Public affairs
  Software engineering
  Technology
  Transport
  Social Sciences
  and Philosophy

  Archaeology
  Economics
  Geography
  History
  History of science
  and technology

  Language
  Linguistics
  Mythology
  Philosophy
  Political science
  Psychology
  Sociology
  Culture and
  Fine Arts

  Classics
  Cooking
  Dance
  Entertainment
  Film
  Games
  Gardening
  Handicraft
  Hobbies
  Holidays
  Internet
  Literature
  Music
  Opera
  Painting
  Poetry
  Radio
  Recreation
  Religion
  Sculpture
  Sports
  Television
  Theater
  Tourism
  Visual arts and design
 
In project management, a work breakdown structure (WBS) is an exhaustive, hierarchical (from general to specific) tree structure of tasks or deliverables that need to be performed in order for a project to be completed.

The purpose of a WBS is to identify terminal elements (the actual items to be done in a project). Therefore, WBS serves as the basis for much of project planning.

Work breakdown structure is a very common project management tool. Many United States government statements of work require work breakdown structures.

Table of contents
1 How to build a WBS
2 Books
3 See also

How to build a WBS

Whether the WBS should be activity-oriented or deliverable-oriented is a subject of much discussion. There are also various approaches to building the WBS for a project (see e.g. How to Build a Work Breakdown Structure below). Project management software, when used properly, can be very helpful in developing a WBS, although in early stages of WBS development, plain sticky notes are the best tool (especially in teams).

An example of a work breakdown for painting a room (activity-oriented) is:

  • Prepare materials
    • Buy paint
    • Buy a ladder
    • Buy brushes/rollers
    • Buy wallpaper remover
  • Prepare room
    • Remove old wallpaper
    • Remove detachable decorations
    • Cover floor with old newspapers
    • Cover electrical outlets/switches with tape
    • Cover furniture with sheets
  • Paint the room
  • Clean up the room
    • Dispose or store left over paint
    • Clean brushes/rollers
    • Dispose of old newspapers
    • Remove covers

The size of the WBS should generally not exceed 100-200 terminal elements (if more terminal elements seem to be required, use subprojects). The WBS should be up to 3-4 levels deep. Each level should be 5-9 elements broad. These suggestions derive from the following facts:
  1. short-term memory capacity is limited to 5-9 items.
  2. having fixed time to plan a project, the more terminal elements you have, the less time there is to pay attention to any single one of them. Consequently, your estimates are less thought-through.
  3. the more terminal elements you have the more there are potential dependencies among them (see fact 2 above for consequences).

Books

  • Carl L. Pritchard. Nuts and Bolts Series 1: How to Build a Work Breakdown Structure. ISBN 1890367125
  • Project Management Institute. Project Management Institute Practice Standard for Work Breakdown Structures. ISBN 1880410818
  • Gregory T. Haugan. Effective Work Breakdown Structures (The Project Management Essential Library Series). ISBN 1567261353

See also

 

 

 

 

 

 